Why “delivery included” is not enough.
An Incoterm with a named place removes the ambiguity: it defines where the seller’s cost and risk end. That is why every quotation states the basis explicitly instead of assuming a default.
Sourcing terms · Commercial boundaries
Delivery basis, payment structure, sampling costs, size grading and inspection criteria all depend on the order. This page explains which terms exist, why each one is confirmed per quotation, and what is never assumed.
The principle
Most sourcing disputes do not start with a bad factory. They start with two parties using the same words for different assumptions — “FOB”, “sample cost”, “approved”. The way to prevent that is to put each term on a document, per order.
An Incoterm with a named place removes the ambiguity: it defines where the seller’s cost and risk end. That is why every quotation states the basis explicitly instead of assuming a default.
Destination, order shape, material sourcing and sampling history all change what is reasonable. A fixed public policy would either overstate or misstate the terms that apply to a specific project.
Inspection criteria, measurement references and acceptance limits are agreed before production, so a finding can be checked against a document rather than an opinion.
Terms confirmed per order
None of these are published as fixed numbers. Each one is stated on the quotation or agreement for the actual order, where the specifics belong.
Quotations state the delivery basis using Incoterms 2020 terminology, so both sides know where the seller’s responsibility ends and yours begins.
Payment structure is set per order in the commercial agreement, not published as a fixed public policy.
Each sampling round is quoted before work starts, including what the fee covers and how courier costs are handled.
Grading runs to your size chart, or to a chart developed for the project — the approved chart becomes the measurement reference for inspection.
The inspection plan, sampling method and acceptance limits for the order are agreed before bulk production, not argued afterwards.
Packing, carton marks, shipping documents and any destination-specific paperwork are confirmed against the delivery basis and your market requirements.
What is never assumed
These apply to every inquiry, sample and order, regardless of how the conversation started.
From first message to loaded cartons
Eight stages carry every order from a text brief to loaded cartons. Each one has a decision attached; only the sampling window is published as a range, and every other duration is stated on the quotation for the actual order.
Category, order shape, destination market, timing context and available files — working estimates are accepted as estimates.
Construction, process and supplier fit are checked against the brief. Open questions come back to you before anything is priced.
Scope, delivery basis with named place, payment structure and sampling costs — each stated for this order.
About 3 working days from a tech pack, drawing or approved reference sample, and about 5 from images and a written brief.
Your approval seals the measurement chart and workmanship reference that bulk is judged against.
Runs against the sealed sample and the recorded materials. Duration is stated on the quotation, not assumed.
In-line checks during sewing and a final inspection before packing, at the acceptance level agreed before production started.
Packing, carton marks and the document set are prepared against the agreed delivery basis and your forwarder.
Reading a quotation
No prices are published on this page because a number without its specification is noise. What is published is the anatomy: what every quotation states, which variables move the figure, and what is never inside it.
Specification basis and approved reference, the Incoterm with its named place, the payment structure, sampling costs and courier responsibility, and the inspection criteria the goods are judged against.
Fabric composition and weight, the colour count, the number of processes — print, embroidery, wash, finishing — quantity per style, and trims or hardware specifications. Change one, and the figure moves for a reason you can see.
Destination duties, taxes and market-entry costs are outside a garment price unless the quotation is explicitly made on a DDP-style basis. Unquoted scope is an open question, not an assumption on either side.
Questions before the next step
These answers define the decision boundary for this page. Commercial terms and factory-specific feasibility still require project review.
Because they depend on the order: destination, order shape, Incoterm, material sourcing and sampling history all change what is reasonable. Publishing one fixed structure would either overstate or misstate the terms that apply to your project. The written quotation is the only reliable source.
Yes. Sampling scope and cost are quoted before any work starts. Share the product direction through the RFQ and the sampling quotation will state what the fee covers, how couriers are handled and what happens if the sample moves to bulk.
Quotations use Incoterms 2020 terminology and state the term and named place for each order. The appropriate basis depends on your destination, freight arrangement and customs setup, so it is confirmed per quotation rather than assumed.
Inspection criteria, checkpoints and acceptance limits are agreed before production, with findings recorded against them. Nonconformities follow the documented decision path on the quality-control framework page — the same evidence standard applies in both directions.
From research to a useful brief
You do not need every answer before the first conversation. Share the product direction, available files, quality expectations and known commercial context.