Buyer FAQ · Current boundaries

Resolve the basic questions before the range review.

Use these answers to understand fit, prepare useful inputs and separate general manufacturing guidance from HACOLD facts that still require verification.

Fit and operating model

Is this the right starting point?

Answers stay specific about what is known, what is a decision method and what needs current factory, commercial or legal confirmation.

01Who is the current HACOLD website designed for?

It is designed for established or growing mid-market womenswear brands, online fashion retailers, importers and sourcing teams managing active development, multiple styles or repeat-order potential. It is not positioned for luxury customization, consumers, print-on-demand, dropshipping or personal small orders.

02Which product categories does HACOLD manufacture?

The current local product focus covers short-sleeve T-shirts, hoodies, polo shirts, trousers and skirts. Material, construction, process and responsible-supplier fit still require a review for the actual style.

03Is HACOLD a factory or a managed manufacturing network?

The public site explains a coordinated apparel manufacturing approach. The exact legal entity, production-site relationship and project allocation should be confirmed in the applicable commercial record.

Project preparation

What should the buyer prepare?

Answers stay specific about what is known, what is a decision method and what needs current factory, commercial or legal confirmation.

01Do we need a final tech pack before making contact?

No. A tech pack, reference sample, drawings or clear product direction can start the review. Label each input as approved, directional or unresolved so the next decision is visible.

02Can fabric, trims and branding be customized?

The buyer can include fabric, colour, trims, labels, print, embroidery and packing requirements in the brief. Availability, process fit, limitations, supplier responsibility, testing and price impact require product-specific confirmation; no unlimited customization claim is made.

03What information makes an RFQ useful?

Share company and market context, product or category direction, development stage, estimated quantity by style, target timing, quality requirements and available files. Estimates may remain explicitly unconfirmed.

04Can confidential files be uploaded through this website?

No. The RFQ sends text only; public file upload is unavailable. Agree an appropriate exchange method before sharing sensitive material.

Commercial boundaries

What still requires project confirmation?

Answers stay specific about what is known, what is a decision method and what needs current factory, commercial or legal confirmation.

01What is the MOQ?

MOQ is not published because it can vary by product, material, color, supplier and program. It remains a project-specific item awaiting factory confirmation.

02What are the sample and production lead times?

No public lead-time promise is approved. Timing depends on the product, current inputs, sample purpose, material availability, approvals, quantity and operating conditions.

03What capacity is available?

Current capacity is not published. Capacity and allocation require present, project-specific confirmation rather than a permanent website number.

04How should quotes from different suppliers be compared?

Normalize the specification, style and color mix, quantity, materials, trims, packaging, quality requirements, destination and timing assumptions. Separate included scope, exclusions and unresolved inputs.

05What information is needed for pricing or a quotation?

Share the product category, style count, specification or reference, material and construction direction, colour and size mix, estimated quantity, branding, packaging, destination and target timing. A quotation remains conditional on the reviewed scope and current supplier inputs.

06How are shipping and delivery terms handled?

No universal shipping or delivery term is published. Destination, packing, hand-off point, transport responsibility, documents, timing assumptions and risk allocation need to be recorded for the actual project.

Quality and evidence

What proof should support the decision?

Answers stay specific about what is known, what is a decision method and what needs current factory, commercial or legal confirmation.

01Which quality checks does HACOLD perform?

The project has not yet verified a publishable HACOLD inspection scope or checkpoint list. The quality pages explain what a buyer should define and which evidence should be requested.

02Which certifications does HACOLD or its factories hold?

No certification claim is approved for publication. Any future certificate must be checked for holder, site, scope, issuer, validity and permission before it appears beside a buyer decision.

03How should a buyer handle a nonconformity?

Define defect classification, evidence, affected scope, containment, decision owner, corrective action and closure record before production. The actual contractual remedy is project-specific.

Contact, IP and agreement

What happens before information or commitments move?

Answers stay specific about what is known, what is a decision method and what needs current factory, commercial or legal confirmation.

01How quickly will HACOLD respond?

Public email and WhatsApp/phone channels for Harry Huang are available on the Contact page. No response-time promise is made on this website.

02Which communication channel should a buyer use?

Use the structured RFQ to send a non-confidential text brief. Public email and WhatsApp/phone remain available as backup routes. File exchange requires separate confirmation.

03Can HACOLD sign an NDA?

No NDA or confidentiality commitment is offered automatically through the website. The parties, authorized signatory, applicable terms and information-handling path must be confirmed for the project.

04Does submitting the RFQ create a contract or production commitment?

No. A submitted RFQ is an inquiry only. It still requires feasibility review, quotation, agreement and authorized acceptance before any commitment exists.

Ready for a project review?

Bring what is known. Mark what is still open.

The RFQ accepts working estimates as working estimates. Review the text before sending it to the HACOLD project contact.