Which fabric does the decision cover?
Use this proposed bulk fabric approval checklist to connect a material reference, the submitted bulk material, supporting evidence and a bounded written decision. It is for apparel buying teams, not fabric-stock shoppers or buyers of an independent testing service.
CBI recommends confirming lab dips, trims and style before a final order when supplying European buyers.[1] The record below is our editorial proposal, not a CBI approval protocol or evidence of HACOLD operations.
- Match the reference
Identify the specification, submission and material covered.
- Check the evidence
Keep observations, required reports and missing inputs distinct.
- Record the scope
Name the reviewer, decision date and unresolved conditions.
Six checks before closing the material review.
- Material identity
- Identify the fabric article, supplier reference, colour and available lot or roll identifiers. Ask which submitted material the record represents.
- Controlled reference
- Link the current specification, component-list revision and retained reference. Keep composition, construction and weight requirements with their controlled documents.
- Colour and appearance
- Record what was compared and under which agreed review conditions. Do not treat a screen image or one colour decision as approval of every material property.
- Required evidence
- List the checks agreed for this project. Connect each available report to its material reference and reviewer; flag missing or unclear coverage instead of inventing a pass result.
- Changes and exceptions
- Identify substitutions, deviations and open questions. Name the person who must review each point and any affected sample, specification or quotation.
- Written decision
- Record the reviewer, date, evidence and material covered. State remaining conditions and exclusions; keep cutting, garment approval and shipment decisions separate.
Leave an auditable question, not a vague “approved”.
Prepare these fields in your own project record. They are unfilled prompts, not an order, test report or completed approval.
Identify
- Reference
- Style, material, specification revision and submitted lot or sample identifier.
- Question
- The exact requirement awaiting a response and the supporting evidence requested.
Resolve
- Next action
- Information to provide, proposed correction and named reviewer.
- Status
- Awaiting evidence, revision requested or scoped decision recorded. An acknowledgment is not closure.
Limit
- Decision
- Reviewer, date, evidence reference and precisely what was accepted or left open.
- Boundary
- Material coverage, remaining conditions and separate authorizations still required.
Keep each source document in its own place.
- Control the complete tech pack
- Identify components in the garment BOM
- Define the sample-review purpose
- Discuss the garment inspection plan
This material record does not replace inspection, establish fabric-test capability or prescribe numerical acceptance limits.
Send the material question with the garment context.
Summarize the garment category, current material reference, working quantity, unresolved question and evidence available. Ask for a project-specific response; agree any confidential document exchange separately because the RFQ is text-only.
Find related working sheets in the buyer toolkit. This page adds no new downloadable fabric-approval form.
Discuss the garment material briefBefore recording a fabric decision.
Does a swatch approval cover every bulk roll?
Do not assume it does. Identify the material and submission actually reviewed, the bulk lot covered and any exclusions. Ask the responsible reviewer what additional evidence is needed for unreviewed material.
Is colour approval also a performance-test result?
No. Keep the colour decision separate from the agreed performance requirements and their evidence. This checklist sets no test method, pass limit or laboratory requirement.
What happens if the fabric reference changes?
Record the old and new references, the proposed reason and the documents affected. Ask the relevant reviewers to reassess the change; do not silently extend an earlier decision to a substitute material.
Does this record authorize cutting or shipment?
No. A material-review decision covers only its stated scope. Production authorization, garment inspection and shipment release remain separate project decisions.